top of page

Glasgow

Costumer: APPLE
- Execution of technical drawings;
- Supply of stone of Vicenza to split columns;
- Supply and installation of substructures;
- Quality control / dray laying;
- Installation of columns in Vicenza stone with mechanical anchoring;
- Installation of Spanish stone coatings with ventilated system;
- Application of protective treatments.

bottom of page